Case studies

Cannon Brewery, Sheffield

The Cannon Brewery redevelopment includes 246 new apartments across 3 buildings. The aim is to create a place where people can not only live, but also work and socialise, while keeping the character of the historic brewery site. Residents will have access to shared facilities including a gym, co-working spaces, a residents’ lounge and a private cinema.

The site is in an urban setting, bounded by a busy road network and near a live music venue. This presents design challenges through acoustic constraints.  

Decarbonised Ltd have been appointed alongside Kaizen-CE by the MEP contractor to develop the Stage 4 design to demonstrate regulatory Part O and Part L compliance, and the Client’s targeted EPC ‘B’ rating.

Through an iterative approach, design proposals include:

  • High-performance thermal envelope: Low U-values, low air permeability and an architectural consideration of continuity at interface details to minimise thermal bridging. 
  • Summertime overheating mitigation: Maximised window openings, solar-control glass and exposed thermal mass.
  • Fossil-fuel free: Exhaust air heat pumps provide an efficient source of domestic hot water generation and ensure that background ventilation requirements are met. A boost function supports the overheating mitigation strategy in easily accessible rooms and apartments with the greatest exposure to noise.

Get started today

Let's make your building perform better

Whether you're at concept stage, working through detailed design, preparing to build or looking at an existing building, we can help you understand its performance and identify practical ways to improve it.