The Cannon Brewery redevelopment includes 246 new apartments across 3 buildings. The aim is to create a place where people can not only live, but also work and socialise, while keeping the character of the historic brewery site. Residents will have access to shared facilities including a gym, co-working spaces, a residents’ lounge and a private cinema.
The site is in an urban setting, bounded by a busy road network and near a live music venue. This presents design challenges through acoustic constraints.
Decarbonised Ltd have been appointed alongside Kaizen-CE by the MEP contractor to develop the Stage 4 design to demonstrate regulatory Part O and Part L compliance, and the Client’s targeted EPC ‘B’ rating.
Through an iterative approach, design proposals include:
- High-performance thermal envelope: Low U-values, low air permeability and an architectural consideration of continuity at interface details to minimise thermal bridging.
- Summertime overheating mitigation: Maximised window openings, solar-control glass and exposed thermal mass.
- Fossil-fuel free: Exhaust air heat pumps provide an efficient source of domestic hot water generation and ensure that background ventilation requirements are met. A boost function supports the overheating mitigation strategy in easily accessible rooms and apartments with the greatest exposure to noise.