Hough Top is a new social housing development for Leeds City Council comprising of 55 houses and 27 apartments. The project is focused upon delivering high quality, energy-efficient and adaptable homes that meet residents’ needs while helping to minimise running costs.
Decarbonised Ltd have been appointed alongside Kaizen-CE by the main contractor to develop the energy strategy from Stage 3 to demonstrate regulatory Part O and Part L compliance, and alignment with Leeds City Council energy policy.
The final design includes inherent efficiencies offering long-term and reliable performance.
- Simple strategy: Developed against the established hierarchy to first reduce demand before the specification of intuitive systems, avoiding over-servicing and complex maintenance.
- High levels of insulation: Achieving low U-values over the entire building envelope.
- Low thermal bridging: Careful architectural detailing to ensure the continuity of insulation at junctions and interfaces. Quantified through detailed PSi-value calculations.
- Balancing solar gain and daylight: Window design and glass performance aim to promote natural light whilst mitigating the risk of summertime overheating.
- Monobloc air source heatpumps: Efficiently providing both heating and hot water, with simple and zoned control.
- Reduced water demand: Through the installation of water efficient sanitaryware.