Case studies

Hough Top, Leeds

Hough Top is a new social housing development for Leeds City Council comprising of 55 houses and 27 apartments. The project is focused upon delivering high quality, energy-efficient and adaptable homes that meet residents’ needs while helping to minimise running costs. 

Decarbonised Ltd have been appointed alongside Kaizen-CE by the main contractor to develop the energy strategy from Stage 3 to demonstrate regulatory Part O and Part L compliance, and alignment with Leeds City Council energy policy.

The final design includes inherent efficiencies offering long-term and reliable performance. 

  • Simple strategy: Developed against the established hierarchy to first reduce demand before the specification of intuitive systems, avoiding over-servicing and complex maintenance.
  • High levels of insulation: Achieving low U-values over the entire building envelope.
  • Low thermal bridging: Careful architectural detailing to ensure the continuity of insulation at junctions and interfaces. Quantified through detailed PSi-value calculations.
  • Balancing solar gain and daylight: Window design and glass performance aim to promote natural light whilst mitigating the risk of summertime overheating.
  • Monobloc air source heatpumps: Efficiently providing both heating and hot water, with simple and zoned control.
  • Reduced water demand: Through the installation of water efficient sanitaryware. 

Get started today

Let's make your building perform better

Whether you're at concept stage, working through detailed design, preparing to build or looking at an existing building, we can help you understand its performance and identify practical ways to improve it.